Photovoltaics Meeting Minutes February 20, 2007

From Ecologic

Jump to: navigation, search

[edit] List of things we accomplished February 20:

  • Moved the inverter over on the mounting board to accommodate other equipment
  • Installed electric meter inside meter pan
  • Installed AC transducer inside the electric meter box, and the data monitor in the box above
  • Connected the wires between the inverter and electric meter