Photovoltaics Meeting Minutes February 20, 2007
From Ecologic
[edit] List of things we accomplished February 20:
- Moved the inverter over on the mounting board to accommodate other equipment
- Installed electric meter inside meter pan
- Installed AC transducer inside the electric meter box, and the data monitor in the box above
- Connected the wires between the inverter and electric meter